MINING.
— I okarito returns. ; Last week the Okarito Gold Dredging i Co. washed up 920z 14d\vt. Tlie report ■ for the previous four weeks states that the total sold won was 51/oz odwt. The total time worked was 402 hours, total non-working time 84 hours. Total yardage j treated was 33,200. an average of 07 euhic : vards per hour. The average value of the ] ground (on the basis of gold worth £4 j per ounce) was 15d per cubic yard. MAHAKIPAWA WASH-UP. The Mnhakipawa (Marlborough) washup for the week realised 250z.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19330628.2.36.2
Bibliographic details
Auckland Star, Volume LXIV, Issue 150, 28 June 1933, Page 4
Word Count
90MINING. Auckland Star, Volume LXIV, Issue 150, 28 June 1933, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.