OPEN FOR CHRISTMAS.
THE NORTHERN HIGHWAY. The northern highway was opened to-day for light traffic along its continuous concreted section to Henderson. The maximum load on the road' until the concrete is completely hardened will be two tons on four wheels. Owing to the large number of requests to have the road open for Christmas, the usual interval of four weeks after the completion of the work has not been insisted upon. The new unused section, which has been closed for some months to enable the concreting work to be carried out extends from Eden View Road to the crest of Waikumete Hill. It was finished three weeks ago last Tuesday.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19261224.2.64
Bibliographic details
Auckland Star, Volume LVII, Issue 305, 24 December 1926, Page 8
Word Count
111OPEN FOR CHRISTMAS. Auckland Star, Volume LVII, Issue 305, 24 December 1926, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.