CHELMSFORD G.M.CO., LIMITED.
The mine manager, under date May 9tn, reports that the ore treated at the mill during the past week has been of payable quality, and has been won from all pans of the mine. Stoping- is proceeding as usual on the No. 1 reef at Nos. 1 and Z levels, and on the No. t reef at No. 1 level, yielding ore of very fair-average value. In the crosscut for No. 2 reef at the No. 2 level a large formation of quartz, ribs and stringers has been cut through, and which, 1 L think, will prove to be the No. 2 reef; at present it is of low grade. A start will be made on Monday with the battery, level.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19020514.2.55.1
Bibliographic details
Auckland Star, Volume XXXIII, Issue 113, 14 May 1902, Page 5
Word Count
124CHELMSFORD G.M.CO., LIMITED. Auckland Star, Volume XXXIII, Issue 113, 14 May 1902, Page 5
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.