SHEET ANCHOR (OMAHU).
(By Telegraph.—Own Correspondent.)
THAMES, this day.
The erection of the battery is completed AA'ith the exception of the tailing's pits. A trial run was made today, when the machinery ran smoothly and gave every satisfaction. Permanent crushing operations Avill be commenced at the end of the month. The tram line which connects the mine witih the battery is also completed. It is' twenty chains long. The plant consists of two steam stamps, Avhich are equal to 10 ordinary stamps, and are capable of treating' 10 tons per.day. At the mine 100 tons of quartz are paddocked ready for treatment. Driving' in the Sheet. Anchor reef is proceeding, and payable ore, shoAving gold freely, is .being broken out. It is probable another trial parcel will be treated at the School of Mines in a few days.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS18991120.2.71
Bibliographic details
Auckland Star, Volume XXX, Issue 275, 20 November 1899, Page 5
Word Count
138SHEET ANCHOR (OMAHU). Auckland Star, Volume XXX, Issue 275, 20 November 1899, Page 5
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.