THE TRUNK RAILWAY.
Our Hamilton correspondent writes:— The last rivet in the viaduct on the Trunk Line, at Waite'ti, was driven on Friday evening last by tho Government Inspector (Mr Chalmers). Mr Robertson, the contractors' agent, has been most successful with the work, and carried it out in good time and without an accident. The whole contract will be completed in the course of a month or six weeks.
The first heading at the Porotarau tunnel on this line is through, and now the work will progress much moro rapidly than hitherto.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS18881128.2.26
Bibliographic details
Auckland Star, Volume XIX, Issue 281, 28 November 1888, Page 5
Word Count
92THE TRUNK RAILWAY. Auckland Star, Volume XIX, Issue 281, 28 November 1888, Page 5
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.