B. OPERATION AND MAINTENANCE 1. Power-stations Kings' Wharf. —The continued poor hydraulic conditions placed a heavy demand on this station. No. 14 turbine was overhauled and a number of replacement parts ordered. This is the first overhaul since Installation in 1931 and the machine was found to be generally in good order. No, 11 turbo-alternator experienced bearing trouble, necessitating special attention. No. 10 turbine shed a number of rotor blades, necessitating the removal of the blades and reducing the number of effective wheels by one. The turbine was serviced and has run satisfactorily since. No. 7 generator was prepared for service. A new air-cooler was installed under No. 12 generator. All boilers were inspected and passed by the Marine Department. A number of worn concrete ash-hoppers were shrouded with steel plate. Dr. V. Armstrong, Fuel Technologist, Department of Scientific and Industrial Research, carried out tests on the large boilers, analysed gases, graded the grit content, and made fuel-economy recommendations. Coal consumed was 51,331 tons, deliveries amounting to 49,895 tons, and 164 tons were sold under orders from the Mining Controller. Of the coal received, 25,268 tons came from the South Island and 24,627 tons from the North Island. The stock in hand at 31st March, 1947, was 1,369 tons. Arapuni and Horahora. —The running-times of the Arapuni and Horahora generators, together with particulars of outages and shutdowns, were as follows :

N6tes.—(a) Shutdown on 11th April, 1946, as water entered the lubricating-oil system due to blocked ejectors, (b) Shutdown on 14th January, 1947, to fit a new stator, winding and change the turbine runner ; work still in progressat end of year. (e) Breakdown of stator winding on 4th March, 1946 ; repairs completed on Bth April, 1946. (a) In service from 10th October, 1946, only. (e) Shutdown 16th to 24th October to change a faulty half coil. (/) Shutdown 30th October to 9th November to install the governor. (g) Shutdown 6th to 11th December to install permanent group C.T.s. (h) Shutdown on 7th April, 1946, for governor adjustments. (£) Shutdown on 3rd April, 1946, for belt repairs. Horahora continued to run on maximum output until 4th. April, 1947, when it was permanently shutdown. A considerable quantity of equipment was salvaged before the station was submerged by the newly formed Karapiro Lake. The 110 kV. 0.C.8.s at Arapuni were modernized by fitting new double-break contacts, &c. Huntly Steam Plant. —This standby station was run over the evening peak-load period five days a week from 25th June to 11th November.

8

Time on Load. Time Idle. Time under Repair. Percentage Availability for Service. Generator No. Hours. Percentage. Hours. Percentage. Not in Demand (Hours). In demand (Hours). Arapuni Power-station A . . • • 2 . ... 3 4 5(d) .. 6 7 8 7,952 7,983 8,108 6,215 3,545 7*039 7,640 7,877 90-78 91-13 92-56 70-95 85-77 87-20 87-21 89-92 808 770 652 522 382 878 1,053 883 9-22 8-79 7-44 5-96 9-24 10-02 12-02 10-08 1,834 (b) 206 (e) 243 (/) 67 (g) '7(a) 189 (c) 100 99-92 100 76-91 95-01 97-22 99-23 100 Horahora Power-station 1 2 3 4 5 6 7 8 7,695 8,104 8,099 8,198 8,254 8,254 8,645 8,618 87-84 92-51 92-45 93-58 94-22 94-22 98-69 98-38 1,065 656 649 562 506 504 115 142 12-16 7-49 7-41 6-42 5-78 5-76 1-31 1-62 12 (h) '2 (i) 100 100 99-86 100 100 99-98 100 100

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert