Page image

0.—2

48

ANNEXURE A. SUMMARY OF REPORTS BY INSPECTORS OF MINKS. Northern Inspection District (Mr. Boyd Bennie, Inspector), Taupiri Collieries Extended Mine.- The mine-workings are located in the north-west and south-west dip sections respectively. In my report of 1917 reference was made to a mine-creep in the No. 6 level, north-west section. The pillar coal crushed to such a degree that there was danger of fire ; the section was therefore closed off and flooded with water, and remains so. In the, extension of the main dip heading, northern section, a considerable, upthrow fault has been met with. At a point a few chains back from the heading-face a drive has been carried into the upper coal-seam, when it was found that only a few feet of fireclay separates the main and the upper coal-scam. The upper coal-seam is about 1.8 ft. thick, of good hard coal. It is intended to work the upper seam first. The work throughout the north-west section is being vigorously prosecuted. At No. 1 level a stone drive is now being driven into Aitken's Freehold (Section 2), and when completed a branch of the main dip haulage will be extended into the coal area lying along the eastern bank of the Waikato River. It is believed that this section contains a large quantity of good coal lying adjacent to the old Kimiliia Mine. Western dip section: The upper coal-seam has been cut into at No. 4 level on the south side, and the workings have been driven close, up to the Ralph's barrier pillar. The main and the upper coal-seams are separated by about 40 ft. of fireclay; Ihe main seam has been worked under this new section, but the, pillar coal has not been extracted. In the upper coal-seam methane litis been given off almost continuously, causing some inconvenience and anxiety at times. Every precaution has been taken for the safety of the, workmen, safety-lamps being used throughout the mine ; in the western dip section generally this gas has been found more frequently than in the northern dip. The mine-workings arc regularly examined, and the company's officials and the workmen's inspectors have made many inspections of the old and disused portions of the mine. No serious falls of roof have been reported during the year. The mine-workings are fully a mile from the winding-shaft, and the time occupied, by the workmen travelling to and from their work in the mine is seriously hindering the daily output of coal. The western and northern sections at the heading-faces are each one mile in length from the junction at the fan shaft, and between the two headings there is a distance of one, mile. There appears to be an extensive area, of coal yet to be worked in this mine. The present winding-shaft being too small to allow of more up-to-date means of raising coal preparations are being made to wind coal up the fan shaft also. Work at the. mine, has been continuous through the year, and there have been no fatal accidents, nor any of a really serious nature. Taupiri Collieries, Rotowaro Mine.- The main-adit dip has been extended to a length of 20 chains in hard coal. Nos. I and 2 levels have been driven 13 and 7 chains respectively, also in good hard coal. There are many segregations of stone in the coal. The mine is comparatively dry. The mining plant and installation of machinery is completed for the present. A sirocco fan has been installed, and the ventilation is good. A ground tram is about to be constructed to connect with the No. 2 Mine tunnel. The, company has erected houses for the manager and the principal officials of the mine, also a number of comfortable cottages with modern conveniences for the miners, at the new township near the Rotowaro Railway-station. A comfortable change-room or shelter-shed has been erected at the mine. The miners have requested the company to build change and bath rooms as required by the. Coal-mines Act. Pukemiro Collieries. Tin- mine has worked continuously through the year, and, despite the loss of time by miners through (lie influenza epidemic, the output for the year was 114,458 tons, an increase of 25,083 tons above the previous year's output. No. 1 Mine continues to produce coal of the best quality, and no further faults have been met with. The section over the upthrow fault is opening up satisfactorily. The ventilation and conditions generally throughout the mine are good. No. 2 Mine, beyond the. downthrow fault: This mine is entered by an adit dip level of about 2 chains in length ; the coal is of good quality, hard and clean, and free from bands of stone ; but there are segregations of stone met with, as in No. 1 Mine. This is characteristic of the high-level areas of the Waikato coalfield. This section is not connected underground with No. 1 Mine. Electrical-haulage endless rope and an electrically driven fan have been installed. I have examined the colliery a number of times during the year and found it, safely worked. The workmen's inspectors have made several inspections of the mine and old workings, and report them all safe. Methane has not, been found in the mines, and open lights are used through the workings, with electric light and telephones at the haulage stations. Waipa Collieries. In the No. 2 section of this colliery the, pillar coal is being worked by six miners, so that the quantity of coal produced is not great, and I anticipate that from six to twelve months will finish the mine. No. 3 section has not been reopened, and it is the intention of the management to work' the coal beyond the upthrow fault from No. 4 Mine level section. A new

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert