Page image

19

a—a

I'he following is a statement showing the value of production and dividends paid by the principal sluicing companies in the Southern District during 1916 :—

No West Coast alluvial mining company declared a dividend during 1916. On the 11th April the Ross Goldfields Reconstructed (Limited) agreed to the voluntary winding-up of the company, being of the opinion that the Ross Flat had, after exhaustive testing, proved valueless as a mining proposition, the sole cause of the company's failure being the low value of wash found in the mine and the high mining-cost due to a costly hydro-electric power plant. The company went into liquidation and sold its plant, &c, repaying therefrom the £7,000 borrowed from the Government under Part Xof the Mining Act. The purchaser of the plant was the Woolston Tanneries (Limited). At Woodstock, on the Hokitika, the Brighton Terrace Gold-mining Company has acquired leases over about 146 acres of the Brighton Terrace, with an option to purchase an additional 100 acres. The company's claims adjoin the south-east boundary of those of Rimu Options (Limited), and consist of portion of the terrace bank of the ancient channel of the Hokitika, which the last-named company is now floating into gold-dredging companies (see accompanying plan). In the early days of the Westland goldfields these terraces were in places successfully worked by driving. The difficulty in obtaining water by gravitation prevented sluicing operations on a large scale. The Woolston Tanneries (Limited) during 1916, having purchased the hydro-electric plant and water-rights from the recently liquidated Ross Goldfields Reconstructed (Limited), formed a company named the Kanieri Forks Power Company for the sale of electric power. This company has constructed a transmission-line from the Kanieri Forks power-station to a point on the south side of the Hokitika immediately opposite the claims of the Brighton Terrace Gold-mining Company, a distance of about five miles, the electric power there to be used for pumping river-water to the dam on the terrace claims above. The pumps consist of two units of two-stage centrifugal type, estimated by the makers (Thompson and Co., Castlemaine) to deliver 1,860 gallons per minute through a nozzle at a pressure of 50 lb. per square inch. The depth of gravel on the company's claims varies from 50 ft. to 70 ft. The system of working is otherwise the same as at Kumara —viz., by sluicing from paddock-faces, and removal of material and water by drainage-tunnel and tail-race into the river, the gold being saved in sluice-boxes near the tunnel-mouth. The drainage adit, formerly known as Douglas tunnel, is about 19 chains in length, and was driven in the (Brighton) bottom some years ago to test the back leads of Rimu Flat. It was subsidized to a small amount by the Government. The company commenced sluicing early during the current year. On the occasion of my inspection during January about 8 cubic feet of water per second was being pumped up into the dam above the ground to be sluiced, 367 electric horse-power being indicated at the pumps. The plant appeared to work satisfactorily. It is proposed to sluice for twelve hours each day, utilizing about 8 sluice heads at the nozzle ; the night water will be stored for flushing the tail-race. Thus 16 heads will be used during the period worked. It is estimated that the capital expenditure on this property, exclusive of the electric-power plant, by the present owners amounts to about £6,000, in addition to £15,000 paid for the property to Rimu Options (Limited). This scheme and operations in connection therewith has been carried out under the superintendence of Mr. Frank B. Powell, mining engineer, of Hokitika. A description of the alluvial claims by the district Inspectors of Mines is contained in Annexure A accompanying this report.

Dividends declared. Name of Company or Party. Deep Stream Gold-mining Company Gabriel's Gully Sluicing Company .. Golden Crescent Sluicing Company Havelock Sluicing Company Ladysmith Gold-mining Company .. Nokomai Sluicing Company Round Hill Gold-mining Company .. Ourawera Gold-mining Company . . 1.17 other claims Value of Gold produced. £ 918 7,61.5 1,131 3,335 4,249 10,425 4,033 1,975 47,465 T-, . i,, lr - I Totals to End of During 1915. lgl6 £ £ 187 2,000 3,760 9,095 175 11,375 1,900 9,300 2,481 16,376 3,600 48,083 706 12,286 300 14,215

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert