North Island Main Trunk Railway, Waiouru Section.—Cutting at 62 m. 30 ch., being worked on three Levels, the Formation Level being 15 ft. below Lowest Level shown in Illustration.

North Island Main Trunk Railway.—Rock-cutting at 108 m. 62 ch. from Marton Junction (about 50 ft. deep).