D— No. 19,
60
RAILWAY CONTRACTS,
and will repay the same to the Contractors, after one month's notice in writing by the Contractor to the Minister demanding payment thereof and giving details of such payment, and the production of vouchers or other proof of such payment. AEBITEATION. 30. Should any dispute arise between the Contractor and the Engineer, or between the Contractor and the Minister for Public Works or the Government, relative to the force and intent and meaning of the specifications, draAvings, or conditions, or to the mode of carrying on the wrorks, or the nature or quality of materials used or supplied to be used, or Avorkmanship of work done, or as to the maintenance of the Avorks, or as to the expense of additional Avorks, or of alterations or deviations from the specifications or plans, or as to any other matter connected with the execution of the works, or with the contract, specifications, drawings, or conditions, or as to any matter which by this contract it is expressly provided is to be settled, ascertained, or determined by arbitration, such dispute shall be referred in writing to the sole determination, arbitrament, and aAvard of the Judge of the Supreme Court assigned to that Judicial District of the Supreme Court within which the w rorks relative to Avhich the dispute shall have arisen have been or are to be'executed, whose aAvard shall be final, binding, and conclusive on all parties: Provided, hoAvever, that before any such dispute as aforesaid shall be so referred, the Contractor shall give to the Minister for Public Works one calendar month's notice in writing of such dispute, and of the matter and cause thereof, and in such notice the Contractor's claim shall be explicitly stated; and if such claim be for pecuniary compensation, the amount thereof shall also be stated. John Cabbuthebs. John Bbogden and Sons.
SPECIFICATION OF THE MANNER OF CONSTRUCTING THE PICTON AND BLENHEIM RAILWAY. GENERAL DESCRIPTION. 1. The line of Railway included under the title " Picton and Blenheim Railway," and to which this specification applies, begins at a point in the ToAvn of Picton and terminates at a point on the Northern Bank of the OpaAva River, as delineated on the accompanying plans and sections ; the total length of the contract being seventeen miles ten chains or thereby, with an addition of one mile of sidings. DRAWINGS. 2. The drawings, including general plans and longitudinal sections, as shown on list A, accompany this Specification. These slioav the character of the works to be executed; further drawings of details Avill be issued from time to time as may be necessary. The general plan is drawn to a scale of three chains to an inch, and shoAvs the course of the Raibvay, the centre line of which has been staked out on the ground, and is represented on the general plan by a red line. The road and stream diversions are shoAvn on the general plan. The longitudinal section is drawn to a horizontal scale of three chains to the inch, and to a vertical scale of thirty feet to the inch. It represents the natural profile of the ground along the centre line of the Railway. The red line shows the level of the bottom of the ballast. On the longitudinal section are shown the positions and sizes of the culverts and bridges described in this Specification. ALIGNMENT OF STEUCTUEES. 3. In the construction of bridges, culverts, road crossings, and generally, it is to be understood that they are to intersect the line of Railway at such angle or curve as may be necessary and approved in each case, although they may be
Description.
Drawings
Alignment,
Use your Papers Past website account to correct newspaper text.
By creating and using this account you agree to our terms of use.
Your session has expired.