ARAPUNI POWER SCHEME
START TO BE MADE TO FILL DAM ON MARCH 24TH
ELECTRICITY 12 DAYS LATER By Telegraph—Press Association. AUCKLAND, this day. . The work of restoring the Arapuni hydro-electrical scheme is so far advanced that a start 'will be made to fill the dam on March 24th, and electricity will again be generated about 12 days later.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WHDT19320317.2.15
Bibliographic details
Waihi Daily Telegraph, Volume XXIX, Issue 8285, 17 March 1932, Page 3
Word Count
58ARAPUNI POWER SCHEME Waihi Daily Telegraph, Volume XXIX, Issue 8285, 17 March 1932, Page 3
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.