OTIRA TUNNEL.
TO EE WORKING THIS YEAR. (By Telegraph—Press Association.) ... CHRISTCHURCH, Saturday. From observations made during his visit of inspection to the Otira tunnel, the Minister of Public Works (Hon. J. G. Coates) states that, generally, tlie work is proceeding satisfactorily. He docs not anticipate that lie will have to alter his statement that the line through the tunnel will be in operation about the end of the present year. Regarding the proposed Teknpo power schemes, Mr. Coates states that as soon as the Power Board (when it is established) shows the power developed at Lake Tckapo can be supplied to consumers at a reasonable rate, a license to proceed will be issued.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WDT19220327.2.29
Bibliographic details
Wairarapa Daily Times, Volume 48, Issue 14625, 27 March 1922, Page 5
Word Count
113OTIRA TUNNEL. Wairarapa Daily Times, Volume 48, Issue 14625, 27 March 1922, Page 5
Using This Item
National Media Ltd is the copyright owner for the Wairarapa Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of National Media Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.