Good Progress In Road Repairs In Buller Gorge
WESTPORT, Last Night (PA).— Good work has been done by the Works Department in filling in the gap on the Buller Gorge Road caused by a big washout on Sunday night, and it is now anticipated that the highway will be reopened for traffic tomorrow night.
Thousands of yards of material have bee n blown from adjacent hillsides and pushed into the gap by bulldozers. It is expected, however, that it. will take a week to complete the railway gap near Cascade, caused by another washout on the same evening. It is estimated that mare than 6000 yards of material will have to be used to fill the 90 feet break in formation. Today gangs of men cleared other slips on the line and work on the major job will be started tomorrow.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WC19491228.2.24
Bibliographic details
Wanganui Chronicle, 28 December 1949, Page 4
Word Count
141Good Progress In Road Repairs In Buller Gorge Wanganui Chronicle, 28 December 1949, Page 4
Using This Item
NZME is the copyright owner for the Wanganui Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.