OPENING DATE OF THE TURAKINA-OKOIA RAIL DEVIATION DEC. 7
(P.A.) Parliament Bldgs.. Oct. 15. In the House of Representatives tonight the Minisier of Works and Railways (Mr. Semple), replying to Mr. E. B. Gordon (Opp., Rangitikei) M».id that the Tura-k*.na-Okoia railway deviation would be opened on December 7. • In a f url her reply to Mr. Gordon, Mr. Semple ‘aid that the cost of the notorious Fordell and Turakina tunnels and the deviation was £1,056,000. Work on the tunnels was neatly finished. Some of the, expenditure would not have heen necessary i» the tunnels had been constructed according to specifications.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WC19471016.2.22
Bibliographic details
Wanganui Chronicle, 16 October 1947, Page 4
Word Count
100OPENING DATE OF THE TURAKINA-OKOIA RAIL DEVIATION DEC. 7 Wanganui Chronicle, 16 October 1947, Page 4
Using This Item
NZME is the copyright owner for the Wanganui Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.