STORM DAMAGE REPAIRED
HUTT RAILWAY IN FULL USE. [ Per Press Association. J WELLINGTON, Sept. .15. For the first time since the disorganisation of the traffic on the Hutt railway line as the result of the wash out by the storm, the double track was in use to-day. This was very welcome in view of the trots and the fact that the airmen arrived at Trentham.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WC19280917.2.51
Bibliographic details
Wanganui Chronicle, Volume 71, Issue 220, 17 September 1928, Page 7
Word Count
65STORM DAMAGE REPAIRED Wanganui Chronicle, Volume 71, Issue 220, 17 September 1928, Page 7
Using This Item
NZME is the copyright owner for the Wanganui Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.