ALREADY AUTHORISED.
Sewer extensions in Wanganui East, Selwyn Street and St. John's Hill; water reticulation (as soon as pipes are reasonably procurable); the construction of the second section of the Westmere reservoir; tar macadam and lowering of thy third block of Victoria Avenue; and the short length of coaciete road on Taupo Quay.Of these, the first is undoubtedly urgent; the second and third are, and might well remain, stationary for the present. With regard to Victoria Avenue, bad though ib is. it .is not likely t-> become worse, and 1 would advise delay, at any rate, until the Taupo Quay job completed, when we will probably find it advisahle to adopt concrete in _this case also. This course) will entail a delay ct three months, or more if found advisable.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WC19170410.2.49.4
Bibliographic details
Wanganui Chronicle, Volume LX, Issue 16949, 10 April 1917, Page 6
Word Count
130ALREADY AUTHORISED. Wanganui Chronicle, Volume LX, Issue 16949, 10 April 1917, Page 6
Using This Item
NZME is the copyright owner for the Wanganui Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.