ROAD SEALING
HIGHWAYS NEAR CAMBRIDGE In continuation of the programmer of re-aligning and sealing of the« f Cambridge-Hamilton Main Highway, .; i a contract has been let by the Public „ Works Department for the sealing of m a further four miles between Cambridge and Tamahere. - '-#.'» 'Acting for the' Main Highways ''*;■"■ Board, the Public Works Department 'fM
has-been carrying out reconstruction work on that section, as with the Hill-crest-Tamahere section, which is proving very satisfactory. . The contractors,for the nfiddle section ofnthe Cambridge-Te Awamutu main highway, are making good pro-v" gress, The work involves shiftinf , thousands of tons of spoil, which is being deposited in the ,swamp to widen the road. The sealing of portions of the Cam-'-hridge-Eureka Highway, which has ' been; under consideration for some"* time, has now been deferred. The?, Cambridge Borough Council allowed for its. share of the cost on this year's I■ estimates. i
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WAIKIN19480312.2.16
Bibliographic details
Waikato Independent, Volume XLIV, Issue 6172, 12 March 1948, Page 4
Word Count
145ROAD SEALING Waikato Independent, Volume XLIV, Issue 6172, 12 March 1948, Page 4
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.