CONSTRUCTING THE CLOCK TOWER AT NEW BRIGHTON.—The foundations for the new clock tower, presented to New Brighton by Mr R. E. Green, arc now being dug Mr Green lias also presented a lower to Sumner, and the work there is under way.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19341207.2.57.1
Bibliographic details
Star (Christchurch), Volume LXVI, Issue 20482, 7 December 1934, Page 5
Word Count
42CONSTRUCTING THE CLOCK TOWER AT NEW BRIGHTON.—The foundations for the new clock tower, presented to New Brighton by Mr R. E. Green, arc now being dug Mr Green lias also presented a lower to Sumner, and the work there is under way. Star (Christchurch), Volume LXVI, Issue 20482, 7 December 1934, Page 5
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.