COLOMBO STREET JOB NEARLY COMPLETED.
The reconstruction of Colombo Street South will be completed on Friday next, when a number of the* men now engaged on the job will be transferred to work in Hare wood Road, Papanui. Councillor J. W. Beanland, chairman of the Works Committee, said this morning that he regretted the necessity for putting off the men engaged on the Colombo Street job, and he was endeavouring to place as many of them as possible in other jobs. It was intended to push on with the reconstruction in bitumen of Harewood Road, and when that was completed a start would be made with similar work in Westminster Street. But these jobs were included in the loan schedule. He regretted that it was not possible to put in hand any other new works that would absorb labour at present.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19301201.2.114
Bibliographic details
Star (Christchurch), Issue 19241, 1 December 1930, Page 9
Word Count
141COLOMBO STREET JOB NEARLY COMPLETED. Star (Christchurch), Issue 19241, 1 December 1930, Page 9
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.