WAITAKI POWER SCHEME WORKS.—The Waitaki River, about three miles above Kurow. The bridge shown here was the first work completed. The coffer dam, projecting from the bridge, is about 100 feet long. When the work is completed the dam will stand about 70 feet above the normal surface of the river.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19291217.2.15.1
Bibliographic details
Star (Christchurch), Issue 18946, 17 December 1929, Page 3
Word Count
51WAITAKI POWER SCHEME WORKS.—The Waitaki River, about three miles above Kurow. The bridge shown here was the first work completed. The coffer dam, projecting from the bridge, is about 100 feet long. When the work is completed the dam will stand about 70 feet above the normal surface of the river. Star (Christchurch), Issue 18946, 17 December 1929, Page 3
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.