COLERIDGE DUPLICATION.
Mr F. Langbein, District Engineer for the Public Works Department, in-
formed a ‘ : Lyttelton Times ’ ’ reporter yesterday that tenders will be called almost immediately for the extension to the power house building, in connection with the duplication of the Lake Coleridge hydro-electric plant. The building when completed will form part of the existing power house. The excavations for the building are already in hand.
The contractors for the new tunnel in connection with the duplication work have made arrangements for obtaining a pump capable of dealing with the water that is soaking into the centre shaft. In the meantime the work* is suspended in that part of the tunnel, but the men are still able to w’ork at both ends of the tunnel, and also on the excavation of the crossdrive from the old centre shaft to the new centre shaft.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TS19240715.2.101
Bibliographic details
Star (Christchurch), Issue 17342, 15 July 1924, Page 11
Word Count
143COLERIDGE DUPLICATION. Star (Christchurch), Issue 17342, 15 July 1924, Page 11
Using This Item
Star Media Company Ltd is the copyright owner for the Star (Christchurch). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Star Media. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.