NAPIER-WAIROA LINE
OPENING NEXT MONTH Within a month, according to information received in Wairoa and Gisborne, the Railway Department will inaugurate regular passenger and freight services on the Napier-Wairoa section of the East Coast Main Trunk line. An announcement of the actual date of commencement is awaited with keen Interest, as much in the Gisborne district as in Wairoa, for the opportunity of travelling by rail between Wairoa and Napier will be much appreciated by many people for whom road travel is full of disadvantages, in spite of the excellence of the service provided. Works gangs are putting the final pouches to the railway yards, sidings, station buildings, and other features of the section which will contribute to smooth working of the passenger services. At Wairoa there has been some activity in the station yards, where the passenger platform has been reformed in preparation for sealing with bitumen. Other work, some of it similar in character, has been proceeding at various points along the line, and final attention has been given to the ballasting of the rails.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THD19390605.2.106
Bibliographic details
Timaru Herald, Volume CXLVI, Issue 21363, 5 June 1939, Page 12
Word Count
177NAPIER-WAIROA LINE Timaru Herald, Volume CXLVI, Issue 21363, 5 June 1939, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Timaru Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.