There is a possibility that before the end of the present year petrol-driven passenger carriages may be installed on the Wellington-Masterton section of the railway system. These are expected to do the journey between the two centres, it is stated, in about two hours. Three of these trains a day will probably be run to start with.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THD19341110.2.103.4
Bibliographic details
Timaru Herald, Volume CXXXVIII, Issue 19953, 10 November 1934, Page 19
Word Count
57Page 19 Advertisements Column 4 Timaru Herald, Volume CXXXVIII, Issue 19953, 10 November 1934, Page 19
Using This Item
Stuff Ltd is the copyright owner for the Timaru Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.