Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image

GENERATING SCHEME. —Crons Section through the power house at Waitaki, showing the generating scheme. The diagram shows the intake and the channel through which the water passes to one of the turbines which is seen in position. The effective head is 7 Oft. and the turbines develop 125 r.p.m. Two 16.166 k.v.a. English electric generators hare been installed, with provision for five units. The diagram shows the control room, in which are the main switch-board and the sectional leads. The arrangement of the overhead crane, with u. lifting capacity of 120 tons, is clearly shown.

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/THD19341027.2.51.1

Bibliographic details

Timaru Herald, Volume CXXXVIII, Issue 19941, 27 October 1934, Page 10

Word Count
95

GENERATING SCHEME.—Crons Section through the power house at Waitaki, showing the generating scheme. The diagram shows the intake and the channel through which the water passes to one of the turbines which is seen in position. The effective head is 7Oft. and the turbines develop 125 r.p.m. Two 16.166 k.v.a. English electric generators hare been installed, with provision for five units. The diagram shows the control room, in which are the main switch-board and the sectional leads. The arrangement of the overhead crane, with u. lifting capacity of 120 tons, is clearly shown. Timaru Herald, Volume CXXXVIII, Issue 19941, 27 October 1934, Page 10

GENERATING SCHEME.—Crons Section through the power house at Waitaki, showing the generating scheme. The diagram shows the intake and the channel through which the water passes to one of the turbines which is seen in position. The effective head is 7Oft. and the turbines develop 125 r.p.m. Two 16.166 k.v.a. English electric generators hare been installed, with provision for five units. The diagram shows the control room, in which are the main switch-board and the sectional leads. The arrangement of the overhead crane, with u. lifting capacity of 120 tons, is clearly shown. Timaru Herald, Volume CXXXVIII, Issue 19941, 27 October 1934, Page 10

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert