PATETONGA MAIN ROAD
METALLING COMMENCED From Our Own Com'espondent MORRINSVILLE, Friday. The metalling of the lower main road, Patetonga, was commenced recently, when about 50yds of stone from the contractor’s quarry at Maukoro were spread to £orm the bottom course. It is hoped to increase the daily output of the quarry to over 1 00yds daily, and to complete the road as far as Kaihere this season. The quarry has been fitted with modern machinery, including a powerful steam-engine, compressed air-drills and high-pressui'e water for sluicing. The Land Drainage Department’s work of preparing the' road is well advanced.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19291102.2.47
Bibliographic details
Sun (Auckland), Volume III, Issue 810, 2 November 1929, Page 6
Word Count
98PATETONGA MAIN ROAD Sun (Auckland), Volume III, Issue 810, 2 November 1929, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.