OPENING UP NEW COASTAL COUNTRY—The new bridge which spans the Motu River between Opotiki and Cape Runaway, will soon be ready for traffic. Gaps along this coastal route.are gradually being completed, and the new road, which runs in sight of the Bay of Plenty coast most of the way, should attract tourists. The bridge is over 500 ft long and cost £17,777.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290522.2.187.6
Bibliographic details
Sun (Auckland), Volume III, Issue 669, 22 May 1929, Page 18
Word Count
62OPENING UP NEW COASTAL COUNTRY—The new bridge which spans the Motu River between Opotiki and Cape Runaway, will soon be ready for traffic. Gaps along this coastal route.are gradually being completed, and the new road, which runs in sight of the Bay of Plenty coast most of the way, should attract tourists. The bridge is over 500ft long and cost £17,777. Sun (Auckland), Volume III, Issue 669, 22 May 1929, Page 18
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.