COMMERCIAL.
LEAD AND TIN. London, January 4. Tin.—Spot £l9l 10s, three months £lB5. Lead, £ls 12s Gd. AUSTRALIAN MINE RETURNS. (Recmv-d 5, 8.55 a. in A Melbourne, January 5. The Mount Lyoll returns from December 11th to 27th inclusive show that 5802 tons of ore were treated, also twenty seven tes of i'”. ran use' 1 ore. Only one blast furnace was Ir operation owing to shortage of men. More will be started as the output increases. The converters resumed running during the current half year. The company consigned forty-one tons of blister copper. Brisbane, January 5. During December the Mount Morgan gold reduction works treated GOl9 tons of ore, producing 3050 ounces of gold. The mine produced 522 tons of blister copper, containing 517 ions of copper and 6382 ounces of gold. The total value of the output was £GB,OG4.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/STEP19120105.2.37
Bibliographic details
Stratford Evening Post, Volume XXXII, Issue 19, 5 January 1912, Page 5
Word Count
141COMMERCIAL. Stratford Evening Post, Volume XXXII, Issue 19, 5 January 1912, Page 5
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.