Plans have been prepared by the Public Works Department for the deepening. widening and straightening of four miles of the lower reaches of the hlangawara River, between Tuupiri and O'lini. The work, which will lie let by contract, is part of tile comprehensive scheme for draining the Taupiri swamp.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/PBH19330928.2.140
Bibliographic details
Poverty Bay Herald, Volume LX, Issue 18205, 28 September 1933, Page 8
Word Count
49Untitled Poverty Bay Herald, Volume LX, Issue 18205, 28 September 1933, Page 8
Using This Item
The Gisborne Herald Company is the copyright owner for the Poverty Bay Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.