A NEW BRIDGE FOR THE WAIHI RIVER. The new bridge of concrete and iron on the Main Highway between Winchester and Geraldine being constructed at a cost of about £4000.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW19310804.2.163.3
Bibliographic details
Otago Witness, Issue 4038, 4 August 1931, Page 38
Word Count
30A NEW BRIDGE FOR THE WAIHI RIVER. The new bridge of concrete and iron on the Main Highway between Winchester and Geraldine being constructed at a cost of about £4000. Otago Witness, Issue 4038, 4 August 1931, Page 38
Using This Item
Allied Press Ltd is the copyright owner for the Otago Witness. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.