Construction work on the new Konini traffio bridge received a setback recently, when a heavy flood swept away the wooden structures for the oentre pier (reports the Wairarapa Daily Times). Everything was in roadiness to reoeive the oonorete fillings. Much valuable timber was lost and considerable time tnd expense will be necessary to have fresh timber cut and placed in position.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW19260629.2.91
Bibliographic details
Otago Witness, Issue 3772, 29 June 1926, Page 24
Word Count
61Untitled Otago Witness, Issue 3772, 29 June 1926, Page 24
Using This Item
Allied Press Ltd is the copyright owner for the Otago Witness. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.