THE ELECTRIC LOCOMOTIVES FOR THE OTIRA TUNNEL. Three out of the five machines have been assembled at Addington. Each locomotive is enable of hauling 140 tons up a grade of 1 in 33 at a speed of 25 miles an hour. Each weighs 48 tons. —H. Green, photo.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW19230213.2.118.7
Bibliographic details
Otago Witness, Issue 3596, 13 February 1923, Page 33
Word Count
48THE ELECTRIC LOCOMOTIVES FOR THE OTIRA TUNNEL. Three out of the five machines have been assembled at Addington. Each locomotive is enable of hauling 140 tons up a grade of 1 in 33 at a speed of 25 miles an hour. Each weighs 48 tons. —H. Green, photo. Otago Witness, Issue 3596, 13 February 1923, Page 33
Using This Item
Allied Press Ltd is the copyright owner for the Otago Witness. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.