The Taieri Mouth Bridge: First Pile Driven by the Hon. T. Mackenzie on January 15.
The estimated cost of the bridge is £SOOO, and of this amount the two local bodies concerned.—the Bruce County Council and the Taieri County Council —contributed £1666 and £333 respectively, the Government paying the rest. The length of (he bridge will be close upon 700 ft, with a width of l£ft, and a maximum height in. the two middle spans of 14ft, to enable the largest boats plying on the riverr to pass beneath.
NORTHERN BOWLING ASSOCIATION’S TOURNAMENT: WINNERS OF THE CHAMPION RINKS.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW19120124.2.199.6
Bibliographic details
Otago Witness, Issue 3019, 24 January 1912, Page 45 (Supplement)
Word Count
98The Taieri Mouth Bridge: First Pile Driven by the Hon. T. Mackenzie on January 15. Otago Witness, Issue 3019, 24 January 1912, Page 45 (Supplement)
Using This Item
Allied Press Ltd is the copyright owner for the Otago Witness. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.