MAIN TRUNK RAILWAY.
WELLINGTON, April 15. Mr Holmes, Engineer-in Chief of the Public Works Department, who has returned from the north, to-day informed a Post reporter that he was satisfied that if the weather during the oaminz winter was not unusualiy bad the North Tsland Main Trunk railway would be open for traffic at the end of the yefyj. He thinks that the Makatote viaduct will be finished tn two months, and that at the end of this month the gap between the rail-heads will, be reduced to nine miles.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW19080422.2.77
Bibliographic details
Otago Witness, Issue 2823, 22 April 1908, Page 21
Word Count
90MAIN TRUNK RAILWAY. Otago Witness, Issue 2823, 22 April 1908, Page 21
Using This Item
Allied Press Ltd is the copyright owner for the Otago Witness. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.