Notes from Alexandra. (From Our Own Correspondent.) ALEXANDRA, September 13.
Good progress is being made with the erection of the machinery on the Alexandra Lead dredge. September 14. The returns are above the average. It will be about a month yet before the Enterprise No. 2 finishes Her overhaul. September 16. The Molyneux rose one Saturday afternoon and evening, and fell again yesterday, but is again on the rise. Iti» raining heavily locally. The river is about <Sft 6in above 'normal mark. The Bendigo dredge started work in earnest after midnight on Sunday night. The First Chanc* dredge is shifting farther down the- river. September 16. The Junction Electric dredges were both troubled with the drift last week. The Alpine Consols return was hardly as good as was expected, but broken time interfered a lot with it. The Pioyal Maori is to have a tiial run this week. The Galvanic is supposed to start work today; at least, a crew has gone up. If this dredge gets a bit higher up her claim I think returns will follow.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW19010918.2.63.9
Bibliographic details
Otago Witness, Issue 2479, 18 September 1901, Page 21
Word Count
178Notes from Alexandra. (From Our Own Correspondent.) ALEXANDRA, September 13. Otago Witness, Issue 2479, 18 September 1901, Page 21
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.