"WARDEN'S COURT. Friday, October 7. (Before Mr "Warden Carew.)
The Caledonian Gold Mining Company applied for protection for six months for the following licensed holdings: — No. 58, section 3, block XI, Nenthorn; No. 59, section H-, same block ; No. 57, section 5, same block ; No. 63, section 6, same block ; No. 64-, section 7, same block; No. 79, section 15, same block ; special claim, No. 10, section 8, block XII ; and section 2, block XI, Nenthorn. The holdings had been occupied continuously from the respective dates of the grants of the same until now ; and had been worked by the company for 12 months. The registered office of the company was situated at Wellington, and it was proposed to remove it to Christchurch . or Dunedin, and to re-organise the company, and make
fresh arrangements for further capital to work the mine.— Mr Calvert appeared in support "of the application. — The Warden decided that separate applications would have to be lodged and posted for each holding for which it was sought to obtain protection. DSEDG-ING RETURNS. The secretary Golden Beach Hydraulic, Elevating, and Dredging Company received a telegram from the dredgemastsr on Saturday evening stating he had washed up for 132 hours' dredging 760z 15dwt 18gr of gold. The Dtmedin Stock Exchange report the following returns for last week: — Otago Dredging Company, 320z 12dwt for eight days; Golden Treasure Company, 20£oz for five days. The Clyde Dredging Company (Limited) report a return of 12oz for last week. The dredge is now at work on Frenchman's Beach. The river is sft 2in above its normal mark. Mr Jabez Burton reports that the return from the Ettrick diedge is 13oz lSdwt for the week. Mr R., T. Wheeler, jun., manager of the Golden Terrace Dredsring Company (Limited), reports aieitinf-di Sfcoa-idwt 15gr reioiltd^gr, I for week ended October 7. Mr C. S. Reeves reports that the return from the Enterprise dredge is 'l6oz 9d\vt for the The Upper Waipoii Alluvial Gold Dredging Company (Limited) obtained last week 370z 4dwt of gold for 134 hours' dredging. The Jutland Plat (Waipori) Gold Mining Company (Limited) obtained last week 360z 6dwt of gold for 144 hours' wages' time; 134 hours' actual dredging The Dunedin Stock Exchange reports a ieturn of 450z of gold for 12 days' work from the Golden Run pipes.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/OW18981013.2.96
Bibliographic details
Otago Witness, Issue 2328, 13 October 1898, Page 19
Word Count
385"WARDEN'S COURT. Friday, October 7. (Before Mr "Warden Carew.) Otago Witness, Issue 2328, 13 October 1898, Page 19
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.