A general view of the Pukaki scheme. On the right the Lake can be seen behind the temporary earth dam. In the right foreground a tractor and roller are at work on the foundation for the main earth dam which will incorporate the temporary dam and extend to the concrete tower housing the sluice gates on the extreme left. The concrete spillway will be built in the area in the immediate foreground.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ODT19480416.2.42.1
Bibliographic details
Otago Daily Times, Issue 26747, 16 April 1948, Page 4
Word Count
72A general view of the Pukaki scheme. On the right the Lake can be seen behind the temporary earth dam. In the right foreground a tractor and roller are at work on the foundation for the main earth dam which will incorporate the temporary dam and extend to the concrete tower housing the sluice gates on the extreme left. The concrete spillway will be built in the area in the immediate foreground. Otago Daily Times, Issue 26747, 16 April 1948, Page 4
Using This Item
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.