MINING.
• Rising Sun: 30oz 2dwt, 119 hours. The Rise and Shine No. . 2 dredge reports 21oz for five days' dredging. The manager of the Rising Sun mine reports:—During the week ended March 8, timbering at the leading .stope at'the . intermediata level on No. 2 reef was' completed. On No. 1 reef in No. 2 block stoping was continued. The ore broken was of fair grade. The drive north on No. o reef was "timbered close to the face, and passes were placed in position. The face south on No. 3 reef was advanced 16ft. The reef is of poor grade.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ODT19190317.2.59
Bibliographic details
Otago Daily Times, Issue 17575, 17 March 1919, Page 6
Word Count
100MINING. Otago Daily Times, Issue 17575, 17 March 1919, Page 6
Using This Item
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.