ACCURATE WORK WAS NEEDED loinine the first supporting steel arch for the new Narrows Bridge over the Waikato River at Tamahere, near Hamilton, after its two .ection. had been projected from opposite tanks to meet m the centre.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19390529.2.21.6
Bibliographic details
New Zealand Herald, Volume LXXVI, Issue 23358, 29 May 1939, Page 6
Word Count
38ACCURATE WORK WAS NEEDED loinine the first supporting steel arch for the new Narrows Bridge over the Waikato River at Tamahere, near Hamilton, after its two .ection. had been projected from opposite tanks to meet m the centre. New Zealand Herald, Volume LXXVI, Issue 23358, 29 May 1939, Page 6
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.