TRAFFIC BRIDGE REPAIRS
WORK AT HAMILTON DELAYED [from our own correspondent] HAMILTON, Thursday Although the opening of the Fairfield Bridge lias made it possible to close the traffic bridge at Hamilton for repairs, work on the latter bridge is beina held up through lack of steel. Part of the steel required is at present on board ship but work will not be started until all the material necessary has arrived.
It will be several weeks yet before repairs are commenced and the bridjie will then be closed for about a month.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19370507.2.55
Bibliographic details
New Zealand Herald, Volume LXXIV, Issue 22722, 7 May 1937, Page 10
Word Count
91TRAFFIC BRIDGE REPAIRS New Zealand Herald, Volume LXXIV, Issue 22722, 7 May 1937, Page 10
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.