IMPROVING THE MAIN HIGHWAY BETWEEN AUCKLAND AND WHANGAREI A view of the new concrete bridge at the southern end of Orewa Beach, which has been built to replace the old wooden structure on the "ght. The concreting has been completed and work in now proceeding on the approaches. ,■ The bridge is 210 ft. long, with a centre span of 64ft., and two other main spans of 56ft. each.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19350126.2.23.2
Bibliographic details
New Zealand Herald, Volume LXXII, Issue 22018, 26 January 1935, Page 8
Word Count
68IMPROVING THE MAIN HIGHWAY BETWEEN AUCKLAND AND WHANGAREI A view of the new concrete bridge at the southern end of Orewa Beach, which has been built to replace the old wooden structure on the "ght. The concreting has been completed and work in now proceeding on the approaches. ,■ The bridge is 210 ft. long, with a centre span of 64ft., and two other main spans of 56ft. each. New Zealand Herald, Volume LXXII, Issue 22018, 26 January 1935, Page 8
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.