GOOD PROGRESS BEING MADE WITH THE CONSTRUCTION OF THE NEW OREWA BRIDGE A view of the new concrete bridge which is being erected over the estuary at the southern end of Orewa Beach. Provision IS being made for the elimination of the awkward approaches to the old wooden bridge which the new 210 ft. concrete structure Will replace.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19341107.2.35.6
Bibliographic details
New Zealand Herald, Volume LXXI, Issue 21951, 7 November 1934, Page 10
Word Count
58GOOD PROGRESS BEING MADE WITH THE CONSTRUCTION OF THE NEW OREWA BRIDGE A view of the new concrete bridge which is being erected over the estuary at the southern end of Orewa Beach. Provision IS being made for the elimination of the awkward approaches to the old wooden bridge which the new 210 ft. concrete structure Will replace. New Zealand Herald, Volume LXXI, Issue 21951, 7 November 1934, Page 10
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.