AVOIDING FLOODING
« IMPROVEMENT TO ROAD Construction work in connection with the improvement of a length of highway subject to flooding conditions at Whakapara, about 14| miles north of Whangarei, was commenced yesterday, according to advice received by the Automobile Association. During the past winter this road was frequently rendered impassable for motor traffic, on one occasion being submerged by as much as 10ft. of water. The raising of the roadway above flood level will provide anuother important link in the provision of an all-weather route between Whangarei and Kaitaia.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19341107.2.139
Bibliographic details
New Zealand Herald, Volume LXXI, Issue 21951, 7 November 1934, Page 15
Word Count
89AVOIDING FLOODING New Zealand Herald, Volume LXXI, Issue 21951, 7 November 1934, Page 15
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.