LONDON DOCKS
IMPROVING APPROACHES BIG SCHEME OF WORKS (Received August 3, 6.55 p.m.) British "Wireless RUGBY, Aug. 2 An important scheme estimated to cost £188,960 for the improvement of the approaches to the London docks has been approved by the London County Council. It is to be put in hand shortly. The existing bridges are inadequate to stand the strain of the enormous daily volume of traffic passing over them and it is proposed to reconstruct those at Stepney, Bennondsey and Poplar. The carriage-ways are to be widened from Bft. to 2oft. and the road approaches improved. The Port of London Authority and the Ministry of Transport will cooperate in the work.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19330804.2.71
Bibliographic details
New Zealand Herald, Volume LXX, Issue 21561, 4 August 1933, Page 9
Word Count
112LONDON DOCKS New Zealand Herald, Volume LXX, Issue 21561, 4 August 1933, Page 9
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.