MINING NEWS.
REPORTS OF MANAGERS. Moanatniari.—Tlie chamber is finished and (he winch has been put into postilion. The winze has still to bo centred, brace made, and rails connected up, also pipe fittings for air-power. This will not take lonpr, and then sinking will be started. Work has been started in the crosscut. The country is of a first-class description, and a fair flow of water is coming from the face. Tiki Talisman Gold Mines.—Driving has been continued on the loader ill the intermediate level. Good ore iB still beinf? obtained. This shows strong hlotches of gold, particularly in the north face.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19280619.2.19
Bibliographic details
New Zealand Herald, Volume LXV, Issue 19976, 19 June 1928, Page 7
Word Count
102MINING NEWS. New Zealand Herald, Volume LXV, Issue 19976, 19 June 1928, Page 7
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.