MINE MANAGERS' REPORTS.
HAURAK3 DEVELOPMENT WORK. Hauraki Mines.—ln the stores nortn trom the rise and winze connection on Legge's reef, filling operations are in progress and no Quarts has been broken for the week. Stoping above the intermediate drive, the reef is somewhat smaller; the drive south to reach the intersection of Legge's reef and the main slide is in 20ft-, and the slide should be met with shortly. Driving on the break in the Welcome Find section has reached a total distance of 175 ft. The mineralised wail bein» followed has been showing quartz during the last few' days. *nd the flow of water 'is increasing.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19210923.2.15
Bibliographic details
New Zealand Herald, Volume LVIII, Issue 17894, 23 September 1921, Page 3
Word Count
107MINE MANAGERS' REPORTS. New Zealand Herald, Volume LVIII, Issue 17894, 23 September 1921, Page 3
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.