MINING
worksop extended Return of Worksop Extended Goid Dredging, Co., Ltd., for the period ending Ctli dune:-29 ounces. 227 hours. 21000 yards. Return of Nemoua Gold Dredging Company Ltd., for the \vek ending 9th June: 30 ounces, 132 hours, 10,200 yards. BIG RIVER Report of Big River Gold Minos Limited fo- the wok ending Bth .Tune : No. 5 Level: North Stope—south end: Filling slope. North Slope : Stone sft 6in wide. No. 6 Level : Continuing level to connect with south winze from No. 5 level. Winze now worked last two days. Reef 4ft wide showing gold. Battery: 32 tons of stone sent to batN’EW RIVER Official return of gold won by the New River Company’s dredge during the week ended Bth instant: 55ozs of gold from 10,000 yards treated in 127 hours dredging WHITE’S ELECTRIC Official return of gold won by While's Electric Company’s dredge during the week ended Bth instant: 43ozs of gold from 6800 yards treated in 132 hours dredging
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NEM19390612.2.158
Bibliographic details
Nelson Evening Mail, Volume LXXIII, 12 June 1939, Page 12
Word Count
161MINING Nelson Evening Mail, Volume LXXIII, 12 June 1939, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Nelson Evening Mail. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.