MACHINERY FOR FINLAND
BRITISH FIRM OBTAINS CONTRACT U H A - Hv Electric Telegraob~-Opvri«htl LONDON, 25th November. The British engineering firm of Metropolitan Vickers has received an order from Finland for machinery for a big waterpower generating station to be built at the Enso Vallinkoshi Falls with an output of 700.000,000 kilowatt hours per annum.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NEM19381126.2.73
Bibliographic details
Nelson Evening Mail, Volume LXXII, 26 November 1938, Page 9
Word Count
54MACHINERY FOR FINLAND Nelson Evening Mail, Volume LXXII, 26 November 1938, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Nelson Evening Mail. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.