ARAPUNI WORKS
SECOND UNIT ALMOST READY
(By Telegraph—Press Association)
HAMILTON, This Day. The work of drying out the second unit of the Arapuni hydro-electric station has been completed. Only a few adjustments are necessary. It is expected that the unit will be generating power for general consumption within a week. Each unit generates 15,000 kilowatts.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NEM19290918.2.43
Bibliographic details
Nelson Evening Mail, Volume LXIV, 18 September 1929, Page 6
Word Count
55ARAPUNI WORKS Nelson Evening Mail, Volume LXIV, 18 September 1929, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Nelson Evening Mail. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.