THE OHAKEA AERODROME . — (Top) No. 1 Hangar, which has passed the main construction stage. (Above.) The 240-ton false-work for arch construction being hauled past the administration block for the building of the arch of No. 2 Hangar.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NA19390421.2.138.1
Bibliographic details
Northern Advocate, 21 April 1939, Page 10
Word Count
37THE OHAKEA AERODROME .—(Top) No. 1 Hangar, which has passed the main construction stage. (Above.) The 240-ton false-work for arch construction being hauled past the administration block for the building of the arch of No. 2 Hangar. Northern Advocate, 21 April 1939, Page 10
Using This Item
NZME is the copyright owner for the Northern Advocate. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.