A concrete chimney is being built at Battersea, London. When completed it will be 275 feet high. It is being constructed without scaffolding, but with a mechanical device at the top, rising as the chimney grows, at the rate og 7ft per day. An electric lift inside carries workmen and material to the top.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NA19360110.2.73.1
Bibliographic details
Northern Advocate, 10 January 1936, Page 6
Word Count
54A concrete chimney is being built at Battersea, London. When completed it will be 275 feet high. It is being constructed without scaffolding, but with a mechanical device at the top, rising as the chimney grows, at the rate og 7ft per day. An electric lift inside carries workmen and material to the top. Northern Advocate, 10 January 1936, Page 6
Using This Item
NZME is the copyright owner for the Northern Advocate. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.